PROJECT
DATA
OWNER
Rensselaer County
ARCHITECT
John G. Waite Associates,
Architects, PLLC
STRUCTURAL ENGINEER
Ryan-Biggs Associates, PC
CONSTRUCTION MANAGER
Turner Construction Co.
COMPLETION DATE
December 2001
CONSTRUCTION COST
$8,792,000
BUILDING AREA
110,600 sq. ft.
|
Rensselaer
County
Court Complex
The second and final phase of the County
Courthouse facility upgrades included renovation and restoration
of the Main Courthouse, Second Street Annex and Third Street Annex.
Full occupancy was maintained during construction
by using swing space created by relocation of the Family Court to
the renovated former County Jail in the first phase of the project.
Existing independent heating and cooling systems were replaced with
a new central plant to reduce maintenance and improve efficiency
and reliability. The Main Courthouse heating plant and the electric
service were displaced during the early stages of construction which
required the temporary rerouting of services to enable the building
to remain occupied.
Mechanical systems were selected to improve overall acoustics in
the sensitive courtroom spaces. Air distribution included a mixture
of variable air volume for support spaces and constant volume systems
for the acoustically sensitive areas. Air handling equipment location
was carefully coordinated to minimize structure borne noise.
One of the biggest challenges was incorporating current state-of-the-art
building systems in a turn of the century courthouse without impacting
the historic character of the building.
|