PROJECT DATA OWNER
Rensselaer
County
ARCHITECT
John G. Waite Associates
Architects, PLLC
STRUCTURAL ENGINEER
Ryan-Biggs Associates, PC
CONSTRUCTION MANAGER
Turner Construction Co.
COMPLETION DATE
March 1998
CONSTRUCTION COST
$4,456,600
BUILDING AREA
42,600 sq. ft. |
Rensselaer County
Family Court Center
The first phase of a planned courthouse
facilities upgrade involved relocation of the county family court
spaces from the overcrowded main county courthouse complex in Troy,
NY to the former Rensselaer County Jail. The main floor level of
the original jail was retained and two new floors were inserted
to create a four level structure.
Building HVAC system consists of variable air volume forced air
heating and cooling in the original jail portion of the building
and four-pipe fan coils in the original attached office building.
Cooling is provided by a remote air-cooled chiller connected by
underground piping. Atmospheric draft low mass copper-fin boilers
provide heat for the building and minimize sound transmission to
the noise sensitive courtroom space above.
An energy saving Building Management System (BMS) provides integration
of critical building functions such as HVAC control, lighting control,
fire alarm, security and card access systems. Particular attention
was paid to mechanical system acoustics and lighting design to enhance
occupant comfort.
Electrical systems work included replacement of the electrical service,
category 5 data network, PBX telephone system, central clock and
PA systems and central emergency poser back-up.
|